Warwick Church of Christ
Project At A Glance
Client: Total Construction
Address: 223 Dragon Street, Warwick, Queensland
Sector: Medical Aged Care
Contract Value: $2.8 million
Contract Length: 14 months
Alpine Refrigeration was engaged by Total Construction to provide specialist installation works for mechanical air conditioning and ventilation services
to an aged care facility in Warwick Queensland.
- The project called for Alpine’s technical expertise to supply, deliver, install, test, commission and service the mechanical systems and associated works at the facility.
- The facility required critical planning due to both the design and quantity of mechanical equipment that maintained control conditions throughout all areas of the building.
- The design installed by the Alpine Team was predominantly Mitsubishi City Multi systems which distributed conditioned air to all rooms and offices. A packaged air conditioner was used to conditioned air to the main auditorium.
- All systems are controlled by Mitsubishi Central Controllers and Sub-Controllers providing the client with individual control over all individual air conditioning systems.
- Kitchen exhaust hoods including mechanical extraction equipment were also installed on the facility.

Alpine Refrigeration was engaged by Northbuild Construction Toowoomba to provide specialist chilled water systems, mechanical air conditioning and ventilation services to a facility of a very specific nature. The project called for Alpine’s flexible approach to heritage listed building refurbishments of a complex and critical nature. By working closely with Northbuild, the outcome was an energy efficient, state of the art air conditioning system that complimented the architectural features of such a historical building. The building structure and cavities posed significant challenges for the Alpine ductwork team along with enabling chilled water piping system, but intense internal design and installation skills provided the results as needed.