Newtown Hotel Liquor Barn
Project At A Glance
Client:
DMC Construction Group
Address:
Newtown Hotel
Hill Street, Toowoomba
Sector: Hospitality
Contract Value: $129,000 +GST.
Contract Length: 3 months - January 2021 to March 2021
Alpine Refrigeration was engaged by DMC Construction Group to provide specialist installation works for air conditioning and refrigeration requirements to the Newtown Hotel Liquor Barn, Toowoomba Qld.
The project called for Alpine’s technical expertise to supply, install, test and commission an 11.2m x 6.3m commercial cold room including an independent temperature controlled wine wing and glass door inserts for retail sale of packaged beer and mixed spirits.
The Newtown Hotel Liquor Barn required close liaising with DMC Construction Group to facilitate the installation of a the large walk-in retail cold room with a 20 glass door insert, refrigeration and air conditioning equipment. The engineering design intent was to maintain the correct product temperature within the walk-in cold room under all climatic variables and controlled, comfort conditions throughout all the retail area.
The design installed by the Alpine team encompassed a custom onsite- constructed cold room with Acpac packaged refrigeration equipment,
controlled by Carel Electronic temperature controls.
Mitsubishi Electric ceiling cassette air conditioning systems were installed throughout the site, with Mitsubishi Electric wall mounted controllers giving each system independent control. All equipment was designed and installed to meet the key criteria of energy efficiency and lengthy equipment life cycle.

Alpine Refrigeration was engaged by Northbuild Construction Toowoomba to provide specialist chilled water systems, mechanical air conditioning and ventilation services to a facility of a very specific nature. The project called for Alpine’s flexible approach to heritage listed building refurbishments of a complex and critical nature. By working closely with Northbuild, the outcome was an energy efficient, state of the art air conditioning system that complimented the architectural features of such a historical building. The building structure and cavities posed significant challenges for the Alpine ductwork team along with enabling chilled water piping system, but intense internal design and installation skills provided the results as needed.