Project At A Glance
Client: Northbuild Construction
Address: 246 Herries Street, Toowoomba, Qld 4350
Sector: Education
Contract Value: $79,060
Contract Length: 5 months
Alpine Refrigeration was engaged by Northbuild Construction to provide specialist installation works for mechanical air conditioning and ventilation services to the new Learn to Swim Pool at The Glennie School. The project called for Alpine’s technical expertise to supply, deliver, install, test, commission and service the mechanical systems.
- The new pool required specialised energy recovery ventilation mechanical equipment that maintains controlled conditions throughout the new building.
- The design installed by the Alpine Team was an Armcor ERV Package unit which distributed conditioned air to the pool area.
- The system was controlled by Innotech Controllers with a individual wall controller providing the client with individual control over unit along with scheduling for after hours economy modes.

Alpine Refrigeration was engaged by Northbuild Construction Toowoomba to provide specialist chilled water systems, mechanical air conditioning and ventilation services to a facility of a very specific nature. The project called for Alpine’s flexible approach to heritage listed building refurbishments of a complex and critical nature. By working closely with Northbuild, the outcome was an energy efficient, state of the art air conditioning system that complimented the architectural features of such a historical building. The building structure and cavities posed significant challenges for the Alpine ductwork team along with enabling chilled water piping system, but intense internal design and installation skills provided the results as needed.